自動焊機(jī)的常見故障都有哪些?
來源:http://www.fangzh.cn/ 發(fā)布時間:2021-12-21 瀏覽次數(shù):0
作為自動焊接設(shè)備,偶爾出現(xiàn)故障是正常的。現(xiàn)在我們來介紹一下管管自動焊機(jī)的常見故障都有哪些?希望通過我們的分享,可以幫助大家對于設(shè)備的使用有更多的經(jīng)驗(yàn)認(rèn)識!
As an automatic welding equipment, occasional failure is normal. Now let's introduce the common faults of pipe automatic welding machine? We hope that through our sharing, we can help you have more experience and understanding of the use of equipment!
管管自動焊機(jī)不易起弧1.如果導(dǎo)電噴嘴燒壞,更換導(dǎo)電噴嘴
Pipe automatic welding machine is not easy to arc 1 If the conductive nozzle burns out, replace the conductive nozzle
2.如果焊絲的選擇與實(shí)際情況不一致,則選擇合適的焊絲檔位
2. If the selection of welding wire is inconsistent with the actual situation, select the appropriate welding wire gear
3.應(yīng)根據(jù)手冊中的規(guī)范選擇不當(dāng)?shù)暮附右?guī)范
3. Improper welding specifications shall be selected according to the specifications in the manual
4.如果焊絲伸出長度不合適,調(diào)整焊絲伸出長度啟動后,送絲緩慢,無法正常焊接
4. If the extension length of the welding wire is not appropriate, adjust the extension length of the welding wire. After starting, the wire feeding is slow and normal welding cannot be carried out
1.焊接電源故障見管道自動焊機(jī)說明書
1. For welding power failure, see the manual of pipeline automatic welding machine
2.如果二次線接觸不良,檢查或通知維修或制造商工件不旋轉(zhuǎn)
2. If the secondary line is in poor contact, check or notify the maintenance or manufacturer that the workpiece does not rotate
1.驅(qū)動電機(jī)斷電,保險(xiǎn)絲熔斷;檢查驅(qū)動電機(jī)的電源
1. The drive motor is powered off and the fuse is blown; Check the power supply of the drive motor
2.變頻驅(qū)動保護(hù);請參閱變頻器的說明那么以上就是我們管管自動焊機(jī)廠家為大家?guī)淼娜績?nèi)容解讀了,希望只要在使用中注意這些細(xì)節(jié),那么我們的工作就會有很好的運(yùn)行效率!
2. Variable frequency drive protection; Please refer to the description of the frequency converter. Then the above is the interpretation of all the contents brought by our pipe automatic welding machine manufacturer. I hope that as long as we pay attention to these details in use, our work will have good operation efficiency!
上一篇:常見自動焊接技術(shù)設(shè)備管理問題
下一篇:力輸送工程系統(tǒng)的設(shè)計(jì)步驟可以分為哪幾部?